Our Work
CWI has been instrumental in building Alberta's telecommunications network by employing trenchless methods (like horizontal directional drilling) to create pathways for cables. Excavating trenches, laying protective conduits and backfilling to restore the surface. For cabinets and vaults – the housings for crucial equipment and connection points – CWI would prepare sites and fully install and secure these structures, ensuring proper grounding and environmental controls. Finally, their teams would manage the delicate process of cable pulling, using specialized equipment and lubricants to draw fiber optic or copper cables through the installed conduits into the cabinets and vaults, where they would be terminated and connected. Our work aims for minimal environmental disruption and long-lasting, reliable infrastructure

BrooksNET 2023 - 2024
Brooks, AB
Full Service Project Management and Execution of over 115,000 meters of drilling, 125,000 meters of cable and associated equipment installation and splicing.
Peak manpower of 35 Drillers, Operators, HSE, technicians and management. Included over 1000 residential, MDU and Enterprise drops.
JASPER 2020
Worked in partnership with Jasper Park Rangers along major highway, bridge and creek area. Safety, Environmental, Pipeline and Alberta Transportation Stakeholders all worked collaboratively assuring Project Success under extremely harsh conditions.




ORCA/ LEDCOR 2024/2025
ST ALBERT, AB
Major project working off Sturgeon road in St Albert. Completed all drilling, equipment installs and remediation during winter months.
TELUS 2024/2025
ST ALBERT, AB
One of many BAU projects working in Northern Alberta. CWI succeeds in quick mobilization of equipment and experienced manpower managing the projects from initiation to final remediation.